Hello all, doesn't look like I'll find a ticket to Mitchell though if I do even last minute I'll go. So I'm planning a Saturday June 7 ride, leaving from Oak Ridge Elementary at 8AM and doing route 28 to Sauratown and Hanging Rock via Dillard. The route is listed as 88 miles. Everyone is welcome, ride at your own pace and we'll regroup as necessary.
VeloProject.com Forums » General Discussion
June 7 ride
(2 posts)-
Posted 7 months ago #
-
Hello All, because of the high heat forecast for Saturday the start time is changed to 7 AM. We'll be pedaling out of Oak Ridge Elementary at 7 to Sauratown and Hanging Rock, approx 88 mi. Also I figure on possibly/probably 4 stops, Moratock Park ( approx 35mi ), Hanging Rock Visitor's Center ( approx 55mi ), the little store in Meadows ( approx 65mi ) and the Citgo in Walnut Cove ( approx 73mi ). On the way up, when we get to Moratock, we'll pow wow and se how everyone's doing with the heat and decide if we need to make a route change.
Mike
Posted 7 months ago #
Reply
You must log in to post.